// Project Details

Introduction

We at SAO International are in the process of building an exciting development project. With a combined 30 years of knowledge and real estate development experience, we bring to you our high desert development project in Adelanto, California.

ADELANTO 395, is located at the NE corner of Rancho Road and Highway 395 in the city of Adelanto, Calif. This development project features a Sinclair gas station with a convenience store, two restaurants and the first 3-star extended stay hotel in the city of Adelanto. The project encompasses 18 acres of commercial/retail and light industrial buildings and will be built out in two phases. For development and financing purposes, the project will be broken into two ownership entities; Adelanto 395A, LLC and Adelanto 395B, LLC.

PHASE 1 ADELANTO 395A, LLC.

Phase One comprises of the following:

A Sinclair gas station with 10 pumps allowing for simultaneous fueling of 20 vehicles

A 5500 sq. ft. convenience store that includes a 1200 sq. ft drive-through coffee and donuts store.

16 fast-charging EV stations.

Two Restaurant Pads:

3,800 sq. ft. sit-down restaurant.

2,600 sq. ft. stacked drive-through restaurant.

Hotel:

A four-storey 100 Microtel Hotel by Wyndham extended-stay style hotel with conference rooms, a gym and a breakfast lobby. 20 fast-charging EV stations with solar panel roof carports.

A Sinclair gas station with 10 pumps allowing for simultaneous fueling of 20 vehicles

A 5500 sq. ft. convenience store that includes a 1200 sq. ft drive-through coffee and donuts store.

16 fast-charging EV stations.

Two Restaurant Pads:

3,800 sq. ft. sit-down restaurant.

2,600 sq. ft. stacked drive-through restaurant.

Hotel:

A four-storey 100-room Microtel Hotel by Wyndham extended-stay style hotel with conference rooms, a gym and a breakfast lobby.
Swimming pool.
20 fast-charging EV stations with solar panel roof carports.

PHASE 2 ADELANTO 395B, LLC.

Phase Two of the development consists of the following:

Three (3) tilt-up warehouses serving the logistics industry

โ€” Building 1 consists of 100,800 sq. ft.
โ€” Building 2 consists of 71,000 sq. ft.
โ€” Building 3 consists of 76,000 sq. ft.

PHASE 2 ADELANTO 395B, LLC.

Phase Two of the development consists of the following:

Three (3) tilt-up warehouses serving the logistics industry

โ€” Building 1 consists of 100,800 sq. ft.
โ€” Building 2 consists of 71,000 sq. ft.
โ€” Building 3 consists of 76,000 sq. ft.

Project Attachments

Adelanto Investment Opportunity

Letter From City of Adelanto

Drawings C Store 395 Rancho

Adelanto 395 B โ€” Phase 2

Letter From City of Adelanto

// Additional Details

Notable Development

In a recent publication dated Feb 20, 2023, city officials announced that SpaceX has chosen Adelanto for aStarlink ground infrastructures facility site to support the companyโ€™s next-generation of satellites. https://www.vvdailypress.com/story/news/2023/02/20/spacex-plans-to-keep-satellites-flying-with-adelanto-ground-station/69918054007/. The Adelanto 395 Project is less than 1.5 miles from the Southern California Logistics Airport (SCLA). City officials are eager to lure workers and visitors alike from the SCLA to new developments in Adelanto. The occupancy rate of hotels in the United States was 67-percent as of August 2022. This is an increase when compared to the previous two years. https://www.statista.com/statistics/206546/us-hotels-occupancy-rate-by-month/.

Consultants:

The following consultants are our partners for Adelanto 395:

Architects & Engineering:

Phase 1: Permits & Approvals:

Project Management:

Breaking Ground:

Financial Analysis

Site Acquisition

Hard Costs

Soft Costs

Risk Analysis

As with any investment, there is an element of risk. However, the city of Adelanto is growing at a projected rate of 17% since 2020. A pro-growth and business-friendly city, Adelanto has opened its doors wide for development. 

Timing

We will be breaking ground in April 2024. Our construction build time is projected to complete the fuel station, convenience store and two restaurants in six- to nine-months. 

Tenants

We have secured tenants for the following:

Phase 1

Phase 2

Exit Strategy

At the completion of each phase or structure, the developer, Sao Development, will refinance to a full-term loan and pay off the construction lenders and investors. We intend to hold and keep the properties for the long- term income.

Conclusion

We at SAO International Inc., look forward to contributing to the continued development and growth of the city of Adelanto, Calif.

// Gallery

Project Gallery

// Gallery

Project Gallery

// Property Video

Checkout our project detailed video tour

// Get In Touch

Let's talk about your investments & how you can earn more of it

Scroll to Top